Target Funtionality

Demo 1. Search for interesting data (i.e. stuff that will be used in Demo 2).

Need:
- MN content available
- MN synchronize
- The search UI (i.e. mercury)
- Retrieve identifiers from search interface - manually or through Zotero
- MN.listObjects()
- MN.getSystemMetadata()
- CN populate search index


Demo 2. The EVA demo. 
This involves an investigator downloading data from DataONE into R and executing the scripts to generate a distribution map. 
Bonus is to publish that back to a Member Node
- about 20sec to run
- single distribution generated
- need to science metadata describing the output

- R plugin, retrieve content given list of IDs
- R scripts produce some output
- Create science metadata for output
- Store output back to member node (KNB) - part of the next demo

Need:
- R script to get content given a list of identifiers
Execute the experiment
Visualize the output.
- resolve()
- get()
- R environment


Demo 3. Basic process of a researcher adding content to a Member Node with some discovery 

- Add content to DataONE using client. Ideal = Morpho, minimum = CLI
- Verify content available on Member Node
- Verify content available on > 1 Member Node
- Content available in search index
- Add discovered content to Zotero

- emphasize that content is being pulled from multiple sources and metadata formats

Need:
- Morpho able to add content to KNB node using existing mechanisms or prefereably through DataONE interface
- create() operational on MNs
- CLI able to execute create()
- synchronization, resolve, search interface

Demo 4. 
- Turn off a member node and show that the content is still retrievable

Need:
- MN replication
- Notification that replication has completed (log messages)


Jan 16-22

- Close core functionality bugs
- CN-CN replication
- Synchronization operational
- ITK CLI and R plugin

Jan 23-29

- CN reserveID
- Content indexing for search
- MN-MN replication operational
- COINS support for Mercury completed (Zotero)
- Prepare initial versions of demonstrations

- User scenarios story outlined
- PPT presentations outlined

Jan 30-Feb 05

- Bug fixing for core services
- Demo preparations and cleanup
- Complete writing tasks

Feb 06-12

- Feb 07: Submit documentation to NSF including:
  - five page overview
  - fifteen page detail
  - Project management plan
  - Cooperative agreement
  - Architecture documentation
- Final versions of demos sorted out, with bug fixes
- Prepare screen captures of demo activities
- Final versions of powerpoints prepared

Feb 13-19

- No development activity on demo machines
- Prepare final versions of screen captures of demonstrations (videos)
- Practice presentations
- Practice demonstrations

Feb 20-26

- Feb 22: Bill + Sayeed provide overview
- Feb 23: DataONE review
- Feb 24: Response to panel questions