Target Funtionality
Demo 1. Search for interesting data (i.e. stuff that will be used in Demo 2).
Need:
- MN content available
- MN synchronize
- The search UI (i.e. mercury)
- Retrieve identifiers from search interface - manually or through Zotero
- MN.listObjects()
- MN.getSystemMetadata()
- CN populate search index
Demo 2. The EVA demo.
This involves an investigator downloading data from DataONE into R and executing the scripts to generate a distribution map.
Bonus is to publish that back to a Member Node
- about 20sec to run
- single distribution generated
- need to science metadata describing the output
- R plugin, retrieve content given list of IDs
- R scripts produce some output
- Create science metadata for output
- Store output back to member node (KNB) - part of the next demo
Need:
- R script to get content given a list of identifiers
Execute the experiment
Visualize the output.
- resolve()
- get()
- R environment
Demo 3. Basic process of a researcher adding content to a Member Node with some discovery
- Add content to DataONE using client. Ideal = Morpho, minimum = CLI
- Verify content available on Member Node
- Verify content available on > 1 Member Node
- Content available in search index
- Add discovered content to Zotero
- emphasize that content is being pulled from multiple sources and metadata formats
Need:
- Morpho able to add content to KNB node using existing mechanisms or prefereably through DataONE interface
- create() operational on MNs
- CLI able to execute create()
- synchronization, resolve, search interface
Demo 4.
- Turn off a member node and show that the content is still retrievable
Need:
- MN replication
- Notification that replication has completed (log messages)
Jan 16-22
- Close core functionality bugs
- CN-CN replication
- Synchronization operational
- ITK CLI and R plugin
Jan 23-29
- CN reserveID
- Content indexing for search
- MN-MN replication operational
- COINS support for Mercury completed (Zotero)
- Prepare initial versions of demonstrations
- User scenarios story outlined
- PPT presentations outlined
Jan 30-Feb 05
- Bug fixing for core services
- Demo preparations and cleanup
- Complete writing tasks
Feb 06-12
- Feb 07: Submit documentation to NSF including:
- five page overview
- fifteen page detail
- Project management plan
- Cooperative agreement
- Architecture documentation
- Final versions of demos sorted out, with bug fixes
- Prepare screen captures of demo activities
- Final versions of powerpoints prepared
Feb 13-19
- No development activity on demo machines
- Prepare final versions of screen captures of demonstrations (videos)
- Practice presentations
- Practice demonstrations
Feb 20-26
- Feb 22: Bill + Sayeed provide overview
- Feb 23: DataONE review
- Feb 24: Response to panel questions