Attendees: Amber, Mike, John Cobb, Bill, Bertram, Dave, Bruce, Suzie, Steph, Steve, Hilmar, Carol


Regrets: Rebecca, Bob Cook, Matt Jones

Call Information:

Conference Call Number: (866) 804-6831
This brings you to our conference call line - next press 1
The conference number is: 21437#

Will also use the epad: http://epad.dataone.org/20110805-LT-VTC if participants can get to it
 
Agenda for 2011-08-05

1. Update on CI (Vieglais)
Scheduled vacation and jury duty has resulted in reduced manpower this week. Implemented a MN stress testing tool. CN work progressing well.  Metacat almost completely in terms of functionality.  Synchronization component closer to completion. Indexing of content on CN progressing well. Support of access control on Mercury being worked on by Ben while on jury duty. Hardware has shipped to UCSB, some delayed.  Expects everything to be operational by late September. Oak Ridge hardware being installed, couple of issues encountered with power but will be sorted out this week and they can start racking equipment next week.  UNM - credentials sorted out of VPN access and next step is to spec out virtual machine requirements.  Need to finalise network topology. LTER have adopted InCommon.  Commited to adding LTER PASTA framework to the DataONE network.  NEON data will be part of this framework.  

2. Leadership Team Charter (Frame)

Please review the Word Document below with suggested Changes and Comments via Track Changes:

https://docs.dataone.org/member-area/committees/management-team/documents/leadership-team/lt-charters/DataONE_Leadership_Team_Charter_v9.docx/at_download/file

Major Changes/Suggestions/Issues that were raised:

 [MF1]LT is really a support (Does not Monitor or Review performance) Rebecca and DataONE Office in this.   
 

 [MF2]I honestly do not think we should add members.   Leave the current members on the LT as is.  
 
I think to involve WG Chairs, there needs to be a periodic meeting (Monthly or every 2 or 3 months) with all of the WG Chairs by the D&O and CE&O and/or Leadership Team.   
 
In LT: 
Perhaps we Include Monthly Summary of CCIT and Monthly Summary of CE&O.   Do this at one of our Friday meetings – just devote ½ the meeting or entire meeting to it.  
 
Comments:
Already greater than 12 on LT?  Extend the limit to 16 and take advantage of the suggested mechanisms to engage WG leads / members?
Likely to be an increase in collaboration, need to account for that type of coordination / communication?
Spelling check - principle and principal :)
***Any additional comments should be sent to Mike by Monday for incorporation - Mike will send out a link.  We can then vote on it via email next Tues / Weds.***


3. ESA Status (Budden)
4. CI Working Groups (Michener)
    In the proposal there were 6 CI Working Groups:
 This was changed at some point to the existing CI Working Groups:
     
Current working groups are listed here: https://docs.dataone.org/member-area/working-groups     

- Federated Security (Butler and Basney)
- Preservation and Metadata 
- Integration and Semantics
- Distributed Storage
- Provenance and Workflows
- Exploration, Visualization and Analysis

     
5. Around the Room

Mike:

UA WG: We are looking at a distribution strategy for the Data Managers Assessment.  Most likely it will be distributed at the Sept EIM Meeting and also to the USGS Data Integration Community at the same time.   The WG would like to relook at the questions before final announcement.   Lisa Zolly, USGS, is taking the lead for the WG.  
Carol: Lisa is also helping us distribute the library and librarian surveys to federal libraries.

Phase 2 of the DataONE Public Web site Usability assestment report was sent into the "BRAD".  Many suggestions are being incorporated in the new site.   

Bertram: summer project (Provenance Repository) wrapping up. Simple prototype 95% ready, need another week. To be demoed at AHM. Interested in opportunities on ProvWG for a "larger" provenance repository project. Connection with DataONE R&D / CCIT would be beneficial.

John:
1. Had call this week with Rebecca, Scott Jensen(IU), and Beth PLale(IU) on pulling together SC11 metadata tutorial. Good progress. One item was to weave a demo (depostiion, archive, search, retrieval, workflow integration) in with the material. We are looking for candidates.

2. With Nick Dexter and Bruce Wilson, moving forward on ORC CN deployment. Proposed rack layout developed along with weight, power, and cabling  rqmts. Bruce may amplify